CTO installs Sub Surface Bunker Drainage Systems into new and existing bunkers. Our drainage systems solve problems such as:
  • silt build up
  • contamination caused by washouts
  • puddling
  • inconsistency

CTO ensures that the outlet for your drainage system is sized properly so that your bunkers will be back in play quickly after a heavy rainfall.

Whatever the issue, CTO will design and install the solution to your bunkers' needs.

   
Bunker Drainage - Step 1
laser grade is set, trenching begins at outlet
Bunker Drainage - Step 2
proper fall ensuring efficient drainage
 
Bunker Drainage - Step 3
system design custom to contour of bunker for
optimal drainage
Bunker Drainage - Step 4
pipe is laid, trench is backfilled in lifts to ensure
no settling